Banham Marshall Residential College, Norfolk

Full Electrical Installation review and management of remediation

BIFM-Wales

Research, Facilitation and Creation, Inaugural Chairman in 2013/2014.

Brecon Museum

Complete design of refurbishment; including lighting, power, BMS (Building Management System) and fire alarm system.

Chelsea and St. Johns Wood

Survey, Design, Tendering and Project Management of electrical refurbishment to 300 quality residential apartments.

Countess Weir, Bascule Bridge, Exeter

Dilapidation report covering drive and lighting produced for major upgrade.

Crickhowell Magistrates Court, Mid-Wales

Refurbishment, full design of heating, emergency lighting and fire alarm system.

Cross Keys Bridge, Sutton Bridge, Lincolnshire

Refurbishment of electrical services, including slew control, lightning and TMS (Traffic Management System) interfaces for River/Road control.

Curzon Street - Mayfair London

Change of use from MI5 headquarters to fully serviced hub of banking for UBS-WDR. Design included distribution, FAS (Fire Alarm System), Cat 5, Lighting, Small Power and Security.

Davygate shopping Centre, York

Preliminary building refurbishment design, and feasibility study of infrastructure and building services for Norwich Union (AVIVA).

Douai Abbey, Berkshire

Dilapidation survey and feasibility study for change of use at major monastic property, including school and leisure centre in Berkshire, for a London based Commercial agent.

Gunton - Lowestoft

Full service infrastructure design for multi-purpose development.

Hounslow Army Barracks

Project Manager to PME for upgrades. Responsibility included refurbishment of Officer's Mess building.

Jewish Care Homes

Management of electrical inspection; dilapidation reporting and risk assessment of all properties.

Jubilee Line Extension Project

Consultant for fire Detection. Review and audit of Contractor's design and specialist solutions for London Underground.

Kap Shui Mun (Lantau Crossing) Bridge

Services design including MCC (Motor Control Centre), ventilation, fire systems and support buildings.

Lowestoft A12 Bridge

Design of Electrical Services, scheme consisted of traffic control and bridge control interfaces.

Norfolk and Norwich Hospital

Borehole installation - design of automatic control installation providing seamless water supply by either borehole or Anglian Water.

Norwich City Football Club

Design and implementation of ground safety works in association with police and Norwich City F.C. following the Taylor Report.

Oresund tunnel, Denmark to Sweden

Tender design submission for Dutch venture group. Specialist advice and design on all servicing elements including lighting, ventilation, emergency systems and SCADA (Supervisory Control and Data Acquisition).

Porchester Crematorium

Refurbishment of all Building Services for local authority.

Saddlebow, King's Lynn

Full preliminary infrastructure design for redundant power station site.

Sainsburys Main Logistics Centre M25 Enfield

Full design of infrastructure including HV (High Voltage) electrical supply, foul and surface water and HP (High Pressure) gas.

Serco (WSM)

Project Manager to Serco for lighting upgrade at Taunton Military establishments:

  • Hydrographic Offices
  • Commando Headquarters

Shoppers Car Park, Woking

The main car park (Peacocks, ToysRus and Wolsey Place) is effectively 3 in 1 structures (2000 spaces). The project value of £10M constructed over 4 years from my electrical design incorporating a new control room, new hub, lighting, help points, ANPR (Automatic Number Plate Recognition) and CCTV security systems.

Singapore Underground Road System

Tunnel services manager responsible for all preliminary and detailed design of services within 40km tunnel network. Elements comprise power, SCADA (Supervisory Control and Data Acquisition), lighting, building services and ventilation plant.

Thames Water STW at Maidenhead

Design of STW including power, MCC, cabling network and SCADA (Supervisory Control and Data Acquisition).

Thameswey Energy

I produced an engineering assessment report of the company's operating procedures and my recommendations have been implemented.

I also produced a risk assessment of the various processes relating to the Primary Energy Plants. They include improvements in:

  • Efficiency
  • Reduction in Operational Costs
  • Health and Safety Measures

I produced a response to the DECG (Department of Energy & Climate Change) in regard to the FIT (Feed in Tarrif) proposals. This government initiative was implemented on April 1st 2010.

Thameswey Energy

Review of QA and creation of Safety Management Systems.

Thameswey Energy - Woking

Full design of 11KV private wire network and distribution system for 2MVA load in shopping centre.

The Beehive Centre - Cambridge

Infrastructure design for major property developer at existing Retail Park in Cambridge. Incorporating 2MVA electrical supply, upgraded gas supply, water supply and fire system.

Victoria Way Car Park, Woking

Total design and refurbishment of central car park, including lighting with daylight energy saving, CCTV, help point and ANPR (Automatic Number Plate Recognition) systems. This was used as the basis of a standard template nationally.

Waterers Pavilion, Woking

Design and installation of a ground source heat pump system providing 12°C all year base temperature (free energy) into air handling / calorifier providing heat and HWS (Hot Water System) to a new sports facility.

West Norwich Hospital

Gastrointestinal Endoscopy unit - new installation including ventilation, BMS (Building Management System) and lighting.

Woking Borough Council

Management of OCS (Facility Provider) covering all Building Services of Corporate Building Stock.

XERGI

Retained consultant providing health & safety guidance and preliminary UK development technical advice.

Provision of 'SMS' (Safety Management System) which formed the template for british standards and E.C. harmonisation.